1. It is used in the Arctic region and is required to be cold-proof and resistant to minus 45 degrees.
2. In order to reduce the moving operation of drilling rigs under bad weather conditions, the system is required to be able to transport, install and disassemble quickly.
1. Adopt the fast-loading design, install all the equipment on the surface of the mud tank (Vibrating Screen Group, mud cleaner, degassing device) to a whole skid seat, and disassemble and transport the whole when moving, it is convenient to move quickly without disassembling the tank surface equipment separately;
2. The thermal insulation shed adopts the retractable design, and there is no need to disassemble the thermal insulation shed when transporting tanks
3. All equipment is made of low-temperature resistant steel materials and adopts low-temperature resistant lubricating grease.
4. Steam heating system and heater are adopted, and U-shaped heat pipeline is arranged inside the tank
construction site picture:
Material separation equipment manufacturer RSD recommended for youGazprom Projects. You can learn moreGazprom ProjectsThe performance advantages, technical parameters, application fields and other information of, at the same time you can also understandDrilling solids control systemOther information or browsing products.